Bridge Abutments & Substructure (NH-107B)

← Back to all Projects

Project Overview

Project Component: MJB-02 Bridge Substructure

Location: Joshimath–Malari Road, Uttarakhand

Stretch: Suraithota to Malari (30.825 km)

Mode: Engineering, Procurement & Construction (EPC)

Project Description

This project involved the construction of bridge abutments and RCC substructure works for MJB-02 Bridge as part of the rehabilitation and upgradation of the Joshimath–Malari (NH-107B) road to double-lane specifications in the state of Uttarakhand. The project was executed on an Engineering, Procurement & Construction (EPC) basis.


Scope of Work

The work covered specific structural elements critical for the bridge's stability. Our scope included:

  • RCC abutment construction.
  • Construction of wing walls and return walls.
  • Reinforcement fixing, shuttering, and concreting.
  • Curing and finishing works strictly in accordance with approved drawings and quality standards.

Project Outcome

The project was executed satisfactorily over an extended duration, demonstrating consistent workmanship, structural accuracy, and effective site management in challenging Himalayan terrain. Performance throughout the project period was found to be satisfactory, reflecting strong technical capability in bridge substructure construction.